Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou Pumped Storage Power Station
Bian, Kang1; Liu, Jian1; Xiao, Ming2; Liu, Zhenping1
2016
发表期刊TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY
ISSN0886-7798
卷号54期号:-页码:123-134
摘要A wide range of cracking happens in concrete lining at the crown of the lower adit and high-pressure bifurcation in the water-filled test of bifurcation tunnel at Huizhou Pumped Storage Power Station. Then a field investigation is undertaken to explore the main reason of such prominent lining cracking. Through investigating several possible inducing factors, it is found that mass defects exist in the concrete lining in constructing bifurcation tunnel, and insufficient thickness of concrete lining is probably the main factor causing lining cracks. In order to verify if this conclusion is reasonable, comparative analysis through numerical simulation is utilized to assess the influence of different concrete thicknesses on tunnel stability for the lower adit and high-pressure bifurcation. And then the fracturing process of concrete lining with the increase of internal water pressure during the water-filled test is simulated. The results reveal that the displacements and tensile strains in the lining crown are significantly bigger than other parts of tunnel, with deficiency in concrete thickness considered. It is also concluded that whether the cavities exist or not in the crown, rather than the cavity thickness, is the main factor influencing the values and distributions of the tensile strains and displacements for tunnel lining. Besides, the distribution of tensile-strain-concentrated zones is approximately in good agreement with the in-situ fractured status of concrete lining. Finally, a conclusion can be drawn that deficiency in concrete thickness in the crown is the primary triggering factor for lining cracking. (C) 2015 Elsevier Ltd. All rights reserved.
关键词Lining cracking Bifurcation tunnel Insufficient thickness Numerical simulation Cause investigation
DOI10.1016/j.tust.2015.10.030
收录类别SCI
语种英语
WOS研究方向Construction & Building Technology ; Engineering
WOS类目Construction & Building Technology ; Engineering, Civil
WOS记录号WOS:000372679400013
出版者PERGAMON-ELSEVIER SCIENCE LTD
引用统计
被引频次:41[WOS]   [WOS记录]     [WOS相关记录]
文献类型期刊论文
条目标识符http://119.78.100.198/handle/2S6PX9GI/3849
专题岩土力学所知识全产出_期刊论文
国家重点实验室知识产出_期刊论文
作者单位1.Chinese Acad Sci, State Key Lab Geomech & Geotech Engn, Inst Rock & Soil Mech ;
2.Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S
推荐引用方式
GB/T 7714
Bian, Kang,Liu, Jian,Xiao, Ming,et al. Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou Pumped Storage Power Station[J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,2016,54(-):123-134.
APA Bian, Kang,Liu, Jian,Xiao, Ming,&Liu, Zhenping.(2016).Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou Pumped Storage Power Station.TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY,54(-),123-134.
MLA Bian, Kang,et al."Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou Pumped Storage Power Station".TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY 54.-(2016):123-134.
条目包含的文件 下载所有文件
文件名称/大小 文献类型 版本类型 开放类型 使用许可
Cause investigation (4849KB)期刊论文作者接受稿开放获取CC BY-NC-SA浏览 下载
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Bian, Kang]的文章
[Liu, Jian]的文章
[Xiao, Ming]的文章
百度学术
百度学术中相似的文章
[Bian, Kang]的文章
[Liu, Jian]的文章
[Xiao, Ming]的文章
必应学术
必应学术中相似的文章
[Bian, Kang]的文章
[Liu, Jian]的文章
[Xiao, Ming]的文章
相关权益政策
暂无数据
收藏/分享
文件名: Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou Pumped Storage Power Station.pdf
格式: Adobe PDF
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。