CSpace

浏览/检索结果: 共2条,第1-2条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
Cause investigation and verification of lining cracking of bifurcation tunnel at Huizhou Pumped Storage Power Station 期刊论文
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 卷号: 54, 期号: -, 页码: 123-134
作者:  Bian, Kang;  Liu, Jian;  Xiao, Ming;  Liu, Zhenping
浏览  |  Adobe PDF(4849Kb)  |  收藏  |  浏览/下载:171/44  |  提交时间:2018/06/05
Lining cracking  Bifurcation tunnel  Insufficient thickness  Numerical simulation  Cause investigation  
Analysis of EDZ Development of Columnar Jointed Rock Mass in the Baihetan Diversion Tunnel 期刊论文
ROCK MECHANICS AND ROCK ENGINEERING, 2016, 卷号: 49, 期号: 4, 页码: 1289-1312
作者:  Hao, Xian-Jie;  Feng, Xia-Ting;  Yang, Cheng-Xiang;  Jiang, Quan;  Li, Shao-Jun
浏览  |  Adobe PDF(3695Kb)  |  收藏  |  浏览/下载:95/38  |  提交时间:2018/06/05
Columnar jointed rock mass  Excavation damaged zone  Time-dependent behaviour  Long-term stability